Bolting for Dominican Republic: Santo Domingo & Boca Chica.
The Caribbean's longest-running LNG import hub at Andrés, Boca Chica, feeding gas-fired power plants around Santo Domingo, plus the large Punta Catalina power complex west of the capital.
- LNGAES Andrés DR Andrés LNG Terminal, Boca Chica — 1.9 million t/year, operating since 2003
- PowerAES Andrés DR Andrés power station, Boca Chica — 319 MW combined-cycle unit on LNG
- PowerDominican Power Partners (AES) Los Mina power station, Santo Domingo — 359 MW combined-cycle plant on LNG
- PowerEmpresa de Generación Eléctrica Punta Catalina (state-owned) Punta Catalina power station, Peravia province — at least 752 MW from two coal-fired units
Listed to describe the area’s industry — not a list of our customers.
What plants in the Dominican Republic order.
Low-temperature bolting that stays tough in cryogenic service — A320 L7 and the A320 stainless grades, Charpy tested to the temperature.
Turbine, boiler and heat-exchanger bolting that holds its load at temperature — B16, A453 660 and 422 stainless studs made to OEM drawings.
Jobs we’ve made in these grades.
Do you have a location in the Dominican Republic?
No — everything is made and shipped from our shop at 18401 Intercontinental Crossing Dr, Houston, TX 77073, about 1,800 miles from the Dominican Republic in a straight line.
How fast can you get bolting to the Dominican Republic?
We ship to the Dominican Republic by international air or ocean freight from Houston, with the delivery time and shipping terms quoted on every order. When a unit is down, call +1 832-446-3442 — answered 24/7, Houston time — and we will quote the fastest air option on the call. Made-to-order parts are quoted with a lead time.
Do you ship to Dominican Republic?
Yes. We ship from Houston by international air or ocean freight from Houston, with the delivery time and shipping terms quoted on every order. Parts are made and certified in Houston before they ship.
What certification comes with the parts?
Every lot ships with an EN 10204 3.1 material test report traceable to the heat. EN 10204 3.2, PMI, Charpy and NACE MR0175 compliance are available on request.
What do LNG terminals in the Dominican Republic usually order?
Low-temperature bolting that stays tough in cryogenic service — A320 L7 and the A320 stainless grades, Charpy tested to the temperature.
What do power stations in the Dominican Republic usually order?
Turbine, boiler and heat-exchanger bolting that holds its load at temperature — B16, A453 660 and 422 stainless studs made to OEM drawings.