Bolting for Trinidad & Tobago: Point Lisas & Point Fortin.
The Caribbean's gas-processing centre: LNG export trains at Point Fortin, methanol and ammonia plants on the Point Lisas Industrial Estate, and offshore gas platforms off the island's east coast.
- LNGAtlantic LNG (Shell, BP, NGC) Atlantic LNG, Point Fortin — four liquefaction trains; the oldest, Train 1, is due to be taken out of service in Q4 2026
- ChemicalProman Point Lisas methanol complex, Point Lisas — M4 and M5 methanol plants running at reduced rates in May 2026
- TerminalPLIPDECO Point Lisas Industrial Port and Estate, Point Lisas — 869.55-hectare industrial estate, the heart of the country's petrochemical sector
- PowerTrinidad Generation Unlimited (TGU) La Brea combined-cycle power plant, La Brea — 720 MW combined-cycle plant
- Offshorebp Trinidad and Tobago Cassia C compression platform, offshore, south-east coast — bp's largest offshore facility in the country, first gas November 2022
Listed to describe the area’s industry — not a list of our customers.
What plants in Trinidad order.
Corrosion-resistant bolting for process lines, reactors and exchangers — 316 stainless (B8M), duplex and nickel alloys where chlorides or acids attack carbon steel.
Low-temperature bolting that stays tough in cryogenic service — A320 L7 and the A320 stainless grades, Charpy tested to the temperature.
Turbine, boiler and heat-exchanger bolting that holds its load at temperature — B16, A453 660 and 422 stainless studs made to OEM drawings.
Flange, valve and tank bolting for storage terminals, fractionators and pipelines — B7 stud bolts with 2H nuts, and L7 where lines run cold.
Bolting for platform modules, subsea equipment and topsides piping built and serviced onshore — B7 and L7 stud bolts with 2H nuts, and super duplex and Inconel 625 where seawater attacks carbon steel.
Jobs we’ve made in these grades.
Do you have a location in Trinidad?
No — everything is made and shipped from our shop at 18401 Intercontinental Crossing Dr, Houston, TX 77073, about 2,600 miles from Trinidad in a straight line.
How fast can you get bolting to Trinidad?
We ship to Trinidad, Trinidad and Tobago by international air or ocean freight from Houston, with the delivery time and shipping terms quoted on every order. When a unit is down, call +1 832-446-3442 — answered 24/7, Houston time — and we will quote the fastest air option on the call. Made-to-order parts are quoted with a lead time.
Do you ship to Trinidad and Tobago?
Yes. We ship from Houston by international air or ocean freight from Houston, with the delivery time and shipping terms quoted on every order. Parts are made and certified in Houston before they ship.
What certification comes with the parts?
Every lot ships with an EN 10204 3.1 material test report traceable to the heat. EN 10204 3.2, PMI, Charpy and NACE MR0175 compliance are available on request.
What do chemical plants in Trinidad usually order?
Corrosion-resistant bolting for process lines, reactors and exchangers — 316 stainless (B8M), duplex and nickel alloys where chlorides or acids attack carbon steel.
What do LNG terminals in Trinidad usually order?
Low-temperature bolting that stays tough in cryogenic service — A320 L7 and the A320 stainless grades, Charpy tested to the temperature.
What do power stations in Trinidad usually order?
Turbine, boiler and heat-exchanger bolting that holds its load at temperature — B16, A453 660 and 422 stainless studs made to OEM drawings.
What do terminals & pipelines in Trinidad usually order?
Flange, valve and tank bolting for storage terminals, fractionators and pipelines — B7 stud bolts with 2H nuts, and L7 where lines run cold.
What do offshore yards & supply bases in Trinidad usually order?
Bolting for platform modules, subsea equipment and topsides piping built and serviced onshore — B7 and L7 stud bolts with 2H nuts, and super duplex and Inconel 625 where seawater attacks carbon steel.
Sources: plipdeco.com · bairdmaritime.com · guardian.co.tt · tgu.co.tt · naturalgasworld.com

