Bolting for Georgia & the Carolinas.
A dense cluster of nuclear stations — Vogtle in Georgia and Duke Energy's Oconee, McGuire and Catawba — plus large coal plants and an LNG export terminal on the Savannah River.
- PowerSouthern Nuclear (Georgia Power) Plant Vogtle, Waynesboro, GA — four units; the largest generator of clean energy in the US
- PowerGeorgia Power Plant Bowen, Cartersville, GA
- LNGKinder Morgan (Elba Liquefaction Company) Elba Island LNG, Savannah, GA — about 2.5 million t/year of liquefaction
- PowerDuke Energy Oconee Nuclear Station, Seneca, SC — three reactors, more than 2,500 MW
- PowerDuke Energy McGuire Nuclear Station, Huntersville, NC — two units
- PowerDuke Energy Catawba Nuclear Station, York, SC — two units
Listed to describe the area’s industry — not a list of our customers.
What plants in Georgia and the Carolinas order.
Low-temperature bolting that stays tough in cryogenic service — A320 L7 and the A320 stainless grades, Charpy tested to the temperature.
Turbine, boiler and heat-exchanger bolting that holds its load at temperature — B16, A453 660 and 422 stainless studs made to OEM drawings.
Jobs we’ve made in these grades.
Do you have a location in Georgia and the Carolinas?
No — everything is made and shipped from our shop at 18401 Intercontinental Crossing Dr, Houston, TX 77073, about 950 miles from Georgia and the Carolinas by road.
How fast can you get bolting to Georgia and the Carolinas?
We ship from Houston 2–4 days by ground, next-day air, or dedicated transport. When a unit is down, call 832-446-3442 — answered 24/7 — and we will quote the fastest option on the call. Made-to-order parts are quoted with a lead time.
What certification comes with the parts?
Every lot ships with an EN 10204 3.1 material test report traceable to the heat. EN 10204 3.2, PMI, Charpy and NACE MR0175 compliance are available on request.
What do LNG terminals in Georgia and the Carolinas usually order?
Low-temperature bolting that stays tough in cryogenic service — A320 L7 and the A320 stainless grades, Charpy tested to the temperature.
What do power stations in Georgia and the Carolinas usually order?
Turbine, boiler and heat-exchanger bolting that holds its load at temperature — B16, A453 660 and 422 stainless studs made to OEM drawings.
Sources: georgiapower.com · power-eng.com · power-eng.com · nsenergybusiness.com · power-eng.com