Bolting for San Francisco Bay Area.
Two crude refineries at Richmond and Martinez, and two former refineries at Rodeo and Martinez now making renewable fuels.
- RefineryChevron Richmond Refinery, Richmond — 245,271 barrels/day
- RefineryPBF Energy Martinez Refinery, Martinez — 156,400 barrels/day
- RefineryPhillips 66 Rodeo Renewable Energy Complex, Rodeo — converted to renewable fuels, about 50,000 barrels/day
- RefineryMarathon / Neste Martinez Renewables, Martinez — former crude refinery converted to renewable fuels
Listed to describe the area’s industry — not a list of our customers.
What plants in the Bay Area order.
Flange and valve bolting for crude, hydrotreating and FCC units — B7 and B7M stud bolts with 2H and 2HM nuts, often PTFE coated, and sour-service grades to NACE MR0175.
Jobs we’ve made in these grades.
Do you have a location in the Bay Area?
No — everything is made and shipped from our shop at 18401 Intercontinental Crossing Dr, Houston, TX 77073, about 1,950 miles from the Bay Area by road.
How fast can you get bolting to the Bay Area?
We ship from Houston 2–4 days by ground, next-day air, or dedicated transport. When a unit is down, call 832-446-3442 — answered 24/7 — and we will quote the fastest option on the call. Made-to-order parts are quoted with a lead time.
What certification comes with the parts?
Every lot ships with an EN 10204 3.1 material test report traceable to the heat. EN 10204 3.2, PMI, Charpy and NACE MR0175 compliance are available on request.
What do refineries in the Bay Area usually order?
Flange and valve bolting for crude, hydrotreating and FCC units — B7 and B7M stud bolts with 2H and 2HM nuts, often PTFE coated, and sour-service grades to NACE MR0175.
Sources: eia.gov · investor.phillips66.com · ir.marathonpetroleum.com

