ISO 9001 Certified·Domestic Manufacturer — Houston, TX
Hot-shot line open832-446-3442
Innovation FastenersInnovation Fasteners
HomeEmergency / Hot-shot 24/7ContactGet a Quote
Service area · Saint John · Red Head

Bolting for Saint John.

Home to Canada's largest refinery, a supertanker crude terminal and an LNG import terminal on the Bay of Fundy.

From our shop to Saint John
DistanceAbout 2,200 miles from our Houston shop
Delivery2–4 days by ground, next-day air, or dedicated transport — we ship to Canada
EmergenciesCall 832-446-3442, answered 24/7 — next-day air or a dedicated truck
CertificationEN 10204 3.1 with every lot; 3.2, PMI, Charpy and NACE on request
Get a QuoteCall 24/7
Industry in the area
  • RefineryIrving Oil Saint John Refinery, Saint John — over 320,000 barrels/day — Canada's largest
  • TerminalIrving Oil Canaport, Saint John — deep-water crude terminal, over 6 million barrels of storage
  • LNGRepsol Saint John LNG, Saint John — up to 1.2 billion cubic feet/day send-out

Listed to describe the area’s industry — not a list of our customers.

By plant type

What plants in Saint John order.

Refineries

Flange and valve bolting for crude, hydrotreating and FCC units — B7 and B7M stud bolts with 2H and 2HM nuts, often PTFE coated, and sour-service grades to NACE MR0175.

LNG terminals

Low-temperature bolting that stays tough in cryogenic service — A320 L7 and the A320 stainless grades, Charpy tested to the temperature.

Terminals & pipelines

Flange, valve and tank bolting for storage terminals, fractionators and pipelines — B7 stud bolts with 2H nuts, and L7 where lines run cold.

Questions from Saint John
Do you have a location in Saint John?

No — everything is made and shipped from our shop at 18401 Intercontinental Crossing Dr, Houston, TX 77073, about 2,200 miles from Saint John by road.

How fast can you get bolting to Saint John?

We ship from Houston 2–4 days by ground, next-day air, or dedicated transport to Canada. When a unit is down, call 832-446-3442 — answered 24/7 — and we will quote the fastest option on the call. Made-to-order parts are quoted with a lead time.

Do you ship to Saint John?

Yes. We ship to Canada from Houston 2–4 days by ground, next-day air, or dedicated transport, and quote the delivery time and shipping terms with every order.

What certification comes with the parts?

Every lot ships with an EN 10204 3.1 material test report traceable to the heat. EN 10204 3.2, PMI, Charpy and NACE MR0175 compliance are available on request.

What do refineries in Saint John usually order?

Flange and valve bolting for crude, hydrotreating and FCC units — B7 and B7M stud bolts with 2H and 2HM nuts, often PTFE coated, and sour-service grades to NACE MR0175.

What do LNG terminals in Saint John usually order?

Low-temperature bolting that stays tough in cryogenic service — A320 L7 and the A320 stainless grades, Charpy tested to the temperature.

What do terminals & pipelines in Saint John usually order?

Flange, valve and tank bolting for storage terminals, fractionators and pipelines — B7 stud bolts with 2H nuts, and L7 where lines run cold.