Bolting for Tabasco & the Bay of Campeche.
The supply ports for Pemex's offshore fields in the Bay of Campeche, the new Olmeca refinery at Dos Bocas and the big onshore gas processing centres around Villahermosa.
- RefineryPemex Olmeca Refinery, Paraíso (Dos Bocas) — 340,000 barrels/day atmospheric distillation
- Gas plantPemex Cactus Gas Processing Centre, Reforma, Chiapas (near Villahermosa) — 1,800 million cubic feet/day sweetening capacity
- Gas plantPemex Nuevo Pemex Gas Processing Centre, Centro, Tabasco — 800 million cubic feet/day sweetening capacity
- OffshoreASIPONA Dos Bocas / Pemex Port of Dos Bocas, Paraíso — supply base for offshore platforms in the Bay of Campeche
- OffshorePemex contractors and suppliers Port of Isla del Carmen, Ciudad del Carmen — about 95% of vessel arrivals serve offshore oil platforms (2012)
- FieldPemex Ku-Maloob-Zaap, Offshore, northwest of Ciudad del Carmen — Pemex's largest producing offshore asset
Listed to describe the area’s industry — not a list of our customers.
What plants in the Bay of Campeche order.
Flange and valve bolting for crude, hydrotreating and FCC units — B7 and B7M stud bolts with 2H and 2HM nuts, often PTFE coated, and sour-service grades to NACE MR0175.
Bolting for gas processing, NGL fractionation and treating units — B7 stud bolts with 2H nuts, B7M and 2HM for sour gas, and L7 on the cold side.
Bolting for platform modules, subsea equipment and topsides piping built and serviced onshore — B7 and L7 stud bolts with 2H nuts, and super duplex and Inconel 625 where seawater attacks carbon steel.
Wellsite, gathering and production-equipment bolting — B7 stud bolts with 2H nuts, sour-service B7M and 2HM to NACE MR0175, and L7 where it runs cold.
Jobs we’ve made in these grades.
Do you have a location in the Bay of Campeche?
No — everything is made and shipped from our shop at 18401 Intercontinental Crossing Dr, Houston, TX 77073, about 1,200 miles from the Bay of Campeche by road.
How fast can you get bolting to the Bay of Campeche?
We ship to the Bay of Campeche, Mexico by international air or ocean freight from Houston, with the delivery time and shipping terms quoted on every order. When a unit is down, call +1 832-446-3442 — answered 24/7, Houston time — and we will quote the fastest air option on the call. Made-to-order parts are quoted with a lead time.
Do you ship to Mexico?
Yes. We ship from Houston by international air or ocean freight from Houston, with the delivery time and shipping terms quoted on every order. Parts are made and certified in Houston before they ship.
What certification comes with the parts?
Every lot ships with an EN 10204 3.1 material test report traceable to the heat. EN 10204 3.2, PMI, Charpy and NACE MR0175 compliance are available on request.
What do refineries in the Bay of Campeche usually order?
Flange and valve bolting for crude, hydrotreating and FCC units — B7 and B7M stud bolts with 2H and 2HM nuts, often PTFE coated, and sour-service grades to NACE MR0175.
What do gas plants in the Bay of Campeche usually order?
Bolting for gas processing, NGL fractionation and treating units — B7 stud bolts with 2H nuts, B7M and 2HM for sour gas, and L7 on the cold side.
What do offshore yards & supply bases in the Bay of Campeche usually order?
Bolting for platform modules, subsea equipment and topsides piping built and serviced onshore — B7 and L7 stud bolts with 2H nuts, and super duplex and Inconel 625 where seawater attacks carbon steel.
What do oil & gas fields in the Bay of Campeche usually order?
Wellsite, gathering and production-equipment bolting — B7 stud bolts with 2H nuts, sour-service B7M and 2HM to NACE MR0175, and L7 where it runs cold.