Bolting for Salina Cruz & the Isthmus of Tehuantepec.
Pemex's largest Pacific-coast refinery and fuel terminal at Salina Cruz, the port at the southern end of the Interoceanic Corridor, and the wind farms of the Isthmus.
- RefineryPemex Antonio Dovalí Jaime Refinery, Salina Cruz — 330,000 barrels/day atmospheric distillation
- TerminalPemex Terminal Marítima Salina Cruz, Salina Cruz
- TerminalASIPONA Salina Cruz Port of Salina Cruz, Salina Cruz — west breakwater expands the anchorage from 55 to more than 200 hectares
- PowerIberdrola México La Ventosa wind complex, Juchitán de Zaragoza — expanded to 102 MW
Listed to describe the area’s industry — not a list of our customers.
What plants in Salina Cruz order.
Flange and valve bolting for crude, hydrotreating and FCC units — B7 and B7M stud bolts with 2H and 2HM nuts, often PTFE coated, and sour-service grades to NACE MR0175.
Turbine, boiler and heat-exchanger bolting that holds its load at temperature — B16, A453 660 and 422 stainless studs made to OEM drawings.
Flange, valve and tank bolting for storage terminals, fractionators and pipelines — B7 stud bolts with 2H nuts, and L7 where lines run cold.
Jobs we’ve made in these grades.
Do you have a location in Salina Cruz?
No — everything is made and shipped from our shop at 18401 Intercontinental Crossing Dr, Houston, TX 77073, about 1,200 miles from Salina Cruz by road.
How fast can you get bolting to Salina Cruz?
We ship to Salina Cruz, Mexico by international air or ocean freight from Houston, with the delivery time and shipping terms quoted on every order. When a unit is down, call +1 832-446-3442 — answered 24/7, Houston time — and we will quote the fastest air option on the call. Made-to-order parts are quoted with a lead time.
Do you ship to Mexico?
Yes. We ship from Houston by international air or ocean freight from Houston, with the delivery time and shipping terms quoted on every order. Parts are made and certified in Houston before they ship.
What certification comes with the parts?
Every lot ships with an EN 10204 3.1 material test report traceable to the heat. EN 10204 3.2, PMI, Charpy and NACE MR0175 compliance are available on request.
What do refineries in Salina Cruz usually order?
Flange and valve bolting for crude, hydrotreating and FCC units — B7 and B7M stud bolts with 2H and 2HM nuts, often PTFE coated, and sour-service grades to NACE MR0175.
What do power stations in Salina Cruz usually order?
Turbine, boiler and heat-exchanger bolting that holds its load at temperature — B16, A453 660 and 422 stainless studs made to OEM drawings.
What do terminals & pipelines in Salina Cruz usually order?
Flange, valve and tank bolting for storage terminals, fractionators and pipelines — B7 stud bolts with 2H nuts, and L7 where lines run cold.