Bolting for Hunter Valley, Newcastle & Sydney.
New South Wales' big coal power stations around the Hunter and Lake Macquarie, a new gas-fired plant at Kurri Kurri, the east coast's largest port at Newcastle and Australia's largest fuel import terminal at Kurnell.
- PowerAGL Bayswater Power Station, Muswellbrook — 2,715 MW coal-fired; expected closure 2033
- PowerOrigin Energy Eraring Power Station, Lake Macquarie — 2,880 MW; extended to April 2029
- PowerDelta Electricity Vales Point Power Station, Lake Macquarie — 1,360 MW; expected closure 2033
- PowerEnergyAustralia Mt Piper Power Station, Lithgow — 1,400 MW; expected closure 2040
- PowerSnowy Hydro Hunter Power Station (Kurri Kurri), Kurri Kurri — two open-cycle gas turbines, up to 750 MW
- TerminalPort of Newcastle Port of Newcastle, Newcastle — largest deepwater port on Australia's east coast
- TerminalAmpol Kurnell fuel import terminal, Kurnell, Sydney — Australia's largest liquid fuel import terminal
Listed to describe the area’s industry — not a list of our customers.
What plants in the Hunter order.
Turbine, boiler and heat-exchanger bolting that holds its load at temperature — B16, A453 660 and 422 stainless studs made to OEM drawings.
Flange, valve and tank bolting for storage terminals, fractionators and pipelines — B7 stud bolts with 2H nuts, and L7 where lines run cold.
Jobs we’ve made in these grades.
Do you have a location in the Hunter?
No — everything is made and shipped from our shop at 18401 Intercontinental Crossing Dr, Houston, TX 77073, about 8,600 miles from the Hunter in a straight line.
How fast can you get bolting to the Hunter?
We ship to the Hunter, Australia by international air or ocean freight from Houston, with the delivery time and shipping terms quoted on every order. When a unit is down, call +1 832-446-3442 — answered 24/7, Houston time — and we will quote the fastest air option on the call. Made-to-order parts are quoted with a lead time.
Do you ship to Australia?
Yes. We ship from Houston by international air or ocean freight from Houston, with the delivery time and shipping terms quoted on every order. Parts are made and certified in Houston before they ship.
What certification comes with the parts?
Every lot ships with an EN 10204 3.1 material test report traceable to the heat. EN 10204 3.2, PMI, Charpy and NACE MR0175 compliance are available on request.
What do power stations in the Hunter usually order?
Turbine, boiler and heat-exchanger bolting that holds its load at temperature — B16, A453 660 and 422 stainless studs made to OEM drawings.
What do terminals & pipelines in the Hunter usually order?
Flange, valve and tank bolting for storage terminals, fractionators and pipelines — B7 stud bolts with 2H nuts, and L7 where lines run cold.
Sources: portofnewcastle.com.au · ampol.com.au · openelectricity.org.au · miningweekly.com · openelectricity.org.au · openelectricity.org.au · snowyhydro.com.au