Bolting for Karratha, Dampier & the Pilbara.
The Burrup Peninsula near Karratha is home to the North West Shelf and Pluto LNG plants and one of the world's largest ammonia sites, while the Pilbara's ports ship iron ore, LNG and salt — a record 804 million tonnes in 2025–26.
- Gas plantWoodside Karratha Gas Plant (North West Shelf), Karratha — supplying energy since the 1980s; now also processes other owners' gas
- LNGWoodside Pluto LNG, Burrup Peninsula — 4.9 Mtpa train in service; second train (about 5 Mtpa) under construction for Scarborough gas
- ChemicalYara Pilbara ammonia and TAN plants, Burrup Peninsula — one of the largest ammonia production sites in the world
- Gas plantSantos Devil Creek Gas Plant, 45 km southwest of Karratha — two-train domestic gas plant, operating since 2011
- TerminalPilbara Ports Port of Dampier, Dampier — 178.3 million tonnes handled in 2025–26
- TerminalPilbara Ports Port of Port Hedland, Port Hedland — 580.4 million tonnes handled in 2025–26
Listed to describe the area’s industry — not a list of our customers.
What plants in Karratha order.
Corrosion-resistant bolting for process lines, reactors and exchangers — 316 stainless (B8M), duplex and nickel alloys where chlorides or acids attack carbon steel.
Low-temperature bolting that stays tough in cryogenic service — A320 L7 and the A320 stainless grades, Charpy tested to the temperature.
Bolting for gas processing, NGL fractionation and treating units — B7 stud bolts with 2H nuts, B7M and 2HM for sour gas, and L7 on the cold side.
Flange, valve and tank bolting for storage terminals, fractionators and pipelines — B7 stud bolts with 2H nuts, and L7 where lines run cold.
Jobs we’ve made in these grades.
Do you have a location in Karratha?
No — everything is made and shipped from our shop at 18401 Intercontinental Crossing Dr, Houston, TX 77073, about 10,300 miles from Karratha in a straight line.
How fast can you get bolting to Karratha?
We ship to Karratha, Australia by international air or ocean freight from Houston, with the delivery time and shipping terms quoted on every order. When a unit is down, call +1 832-446-3442 — answered 24/7, Houston time — and we will quote the fastest air option on the call. Made-to-order parts are quoted with a lead time.
Do you ship to Australia?
Yes. We ship from Houston by international air or ocean freight from Houston, with the delivery time and shipping terms quoted on every order. Parts are made and certified in Houston before they ship.
What certification comes with the parts?
Every lot ships with an EN 10204 3.1 material test report traceable to the heat. EN 10204 3.2, PMI, Charpy and NACE MR0175 compliance are available on request.
What do chemical plants in Karratha usually order?
Corrosion-resistant bolting for process lines, reactors and exchangers — 316 stainless (B8M), duplex and nickel alloys where chlorides or acids attack carbon steel.
What do LNG terminals in Karratha usually order?
Low-temperature bolting that stays tough in cryogenic service — A320 L7 and the A320 stainless grades, Charpy tested to the temperature.
What do gas plants in Karratha usually order?
Bolting for gas processing, NGL fractionation and treating units — B7 stud bolts with 2H nuts, B7M and 2HM for sour gas, and L7 on the cold side.
What do terminals & pipelines in Karratha usually order?
Flange, valve and tank bolting for storage terminals, fractionators and pipelines — B7 stud bolts with 2H nuts, and L7 where lines run cold.
Sources: woodside.com · yara.com.au · dredgewire.com · woodside.com · santos.com

