ISO 9001 Certified·Domestic Manufacturer — Houston, TX
Hot-shot line open832-446-3442
Innovation FastenersInnovation Fasteners
HomeEmergency / Hot-shot 24/7ContactGet a Quote
Service area · Sale · Longford · Traralgon · Morwell · Yallourn · Barry Beach

Bolting for Gippsland & the Latrobe Valley.

The Longford gas plants that process Bass Strait gas — about 40% of east coast gas demand — and the Latrobe Valley's three brown-coal power stations.

From our shop to Gippsland
DistanceAbout 8,900 miles from our Houston shop (straight line)
DeliveryInternational air or ocean freight from Houston, with the delivery time and shipping terms quoted on every order
EmergenciesCall +1 832-446-3442, answered 24/7 (Houston time) — we quote the fastest air freight
CertificationEN 10204 3.1 with every lot; 3.2, PMI, Charpy and NACE on request
Get a QuoteCall 24/7
Industry in the area
  • Gas plantWoodside (Gippsland Basin JV) Longford Gas Plant, Longford, near Sale — two gas plants and a gas conditioning plant, operating since 1969
  • OffshoreWoodside Barry Beach Marine Terminal, Barry Beach — supply base for the Bass Strait platforms
  • PowerAGL Loy Yang A Power Station, Traralgon — 2,295 MW; expected closure 2035
  • PowerAlinta Energy Loy Yang B Power Station, Traralgon — 1,200 MW; expected closure 2047
  • PowerEnergyAustralia Yallourn W Power Station, Yallourn — 1,600 MW; expected closure mid-2028

Listed to describe the area’s industry — not a list of our customers.

By plant type

What plants in Gippsland order.

Gas plants

Bolting for gas processing, NGL fractionation and treating units — B7 stud bolts with 2H nuts, B7M and 2HM for sour gas, and L7 on the cold side.

Power stations

Turbine, boiler and heat-exchanger bolting that holds its load at temperature — B16, A453 660 and 422 stainless studs made to OEM drawings.

Offshore yards & supply bases

Bolting for platform modules, subsea equipment and topsides piping built and serviced onshore — B7 and L7 stud bolts with 2H nuts, and super duplex and Inconel 625 where seawater attacks carbon steel.

Questions from Gippsland
Do you have a location in Gippsland?

No — everything is made and shipped from our shop at 18401 Intercontinental Crossing Dr, Houston, TX 77073, about 8,900 miles from Gippsland in a straight line.

How fast can you get bolting to Gippsland?

We ship to Gippsland, Australia by international air or ocean freight from Houston, with the delivery time and shipping terms quoted on every order. When a unit is down, call +1 832-446-3442 — answered 24/7, Houston time — and we will quote the fastest air option on the call. Made-to-order parts are quoted with a lead time.

Do you ship to Australia?

Yes. We ship from Houston by international air or ocean freight from Houston, with the delivery time and shipping terms quoted on every order. Parts are made and certified in Houston before they ship.

What certification comes with the parts?

Every lot ships with an EN 10204 3.1 material test report traceable to the heat. EN 10204 3.2, PMI, Charpy and NACE MR0175 compliance are available on request.

What do gas plants in Gippsland usually order?

Bolting for gas processing, NGL fractionation and treating units — B7 stud bolts with 2H nuts, B7M and 2HM for sour gas, and L7 on the cold side.

What do power stations in Gippsland usually order?

Turbine, boiler and heat-exchanger bolting that holds its load at temperature — B16, A453 660 and 422 stainless studs made to OEM drawings.

What do offshore yards & supply bases in Gippsland usually order?

Bolting for platform modules, subsea equipment and topsides piping built and serviced onshore — B7 and L7 stud bolts with 2H nuts, and super duplex and Inconel 625 where seawater attacks carbon steel.