Bolting for South Australia: Cooper Basin, Port Bonython & Adelaide.
Australia's largest onshore oil and gas development in the Cooper Basin, processed at Moomba and piped to Port Bonython near Whyalla, plus the Olympic Dam mine and Adelaide's gas-fired power stations.
- Gas plantSantos Moomba Gas Plant, Moomba — central processing hub for the Cooper and Eromanga basins; hosts a CCS project for up to 1.7 Mt CO2e a year
- TerminalSantos Port Bonython, near Whyalla — deep-water port, gas fractionation plant and storage at the end of a 659 km pipeline
- MineBHP Olympic Dam, Roxby Downs
- PowerAGL Torrens Island B Power Station, Adelaide — four 210 MW gas units; scheduled to close 30 June 2028
- PowerOrigin Energy / ATCO Osborne Power Station, Osborne, Adelaide — 204 MW gas combined-cycle
Listed to describe the area’s industry — not a list of our customers.
What plants in South Australia order.
Bolting for gas processing, NGL fractionation and treating units — B7 stud bolts with 2H nuts, B7M and 2HM for sour gas, and L7 on the cold side.
Turbine, boiler and heat-exchanger bolting that holds its load at temperature — B16, A453 660 and 422 stainless studs made to OEM drawings.
Flange, valve and tank bolting for storage terminals, fractionators and pipelines — B7 stud bolts with 2H nuts, and L7 where lines run cold.
Structural and machinery bolting for hoists, crushers, mills and conveyors — A325 and A490 heavy hex bolts, Grade 8 cap screws and A563 nuts, plus machined parts to drawing.
Jobs we’ve made in these grades.
Do you have a location in South Australia?
No — everything is made and shipped from our shop at 18401 Intercontinental Crossing Dr, Houston, TX 77073, about 9,300 miles from South Australia in a straight line.
How fast can you get bolting to South Australia?
We ship to South Australia by international air or ocean freight from Houston, with the delivery time and shipping terms quoted on every order. When a unit is down, call +1 832-446-3442 — answered 24/7, Houston time — and we will quote the fastest air option on the call. Made-to-order parts are quoted with a lead time.
Do you ship to Australia?
Yes. We ship from Houston by international air or ocean freight from Houston, with the delivery time and shipping terms quoted on every order. Parts are made and certified in Houston before they ship.
What certification comes with the parts?
Every lot ships with an EN 10204 3.1 material test report traceable to the heat. EN 10204 3.2, PMI, Charpy and NACE MR0175 compliance are available on request.
What do gas plants in South Australia usually order?
Bolting for gas processing, NGL fractionation and treating units — B7 stud bolts with 2H nuts, B7M and 2HM for sour gas, and L7 on the cold side.
What do power stations in South Australia usually order?
Turbine, boiler and heat-exchanger bolting that holds its load at temperature — B16, A453 660 and 422 stainless studs made to OEM drawings.
What do terminals & pipelines in South Australia usually order?
Flange, valve and tank bolting for storage terminals, fractionators and pipelines — B7 stud bolts with 2H nuts, and L7 where lines run cold.
What do mines & mills in South Australia usually order?
Structural and machinery bolting for hoists, crushers, mills and conveyors — A325 and A490 heavy hex bolts, Grade 8 cap screws and A563 nuts, plus machined parts to drawing.
Sources: santos.com · santos.com · santos.com · en.wikipedia.org · openelectricity.org.au · openelectricity.org.au