Bolting for Qatar – Ras Laffan & Mesaieed.
Qatar's gas industry: the LNG trains, condensate refineries and gas-to-liquids plant of Ras Laffan Industrial City, and the refinery, fertiliser and petrochemical plants of Mesaieed south of Doha.
- LNGQatarEnergy LNG Ras Laffan LNG trains, Ras Laffan — 14 LNG trains, including six 7.8 million tonnes/year mega trains
- RefineryQatarEnergy LNG Laffan Refinery 1 and 2, Ras Laffan — 292,000 barrels/day of condensate refining combined
- ChemicalQatar Shell GTL Pearl GTL, Ras Laffan — designed for 140,000 barrels/day of gas-to-liquids products
- RefineryQatarEnergy Mesaieed refinery, Mesaieed
- ChemicalQAFCO Fertiliser complex, Mesaieed — about 5.6 million tonnes/year of urea and 3.8 million tonnes/year of ammonia
Listed to describe the area’s industry — not a list of our customers.
What plants in Qatar order.
Flange and valve bolting for crude, hydrotreating and FCC units — B7 and B7M stud bolts with 2H and 2HM nuts, often PTFE coated, and sour-service grades to NACE MR0175.
Corrosion-resistant bolting for process lines, reactors and exchangers — 316 stainless (B8M), duplex and nickel alloys where chlorides or acids attack carbon steel.
Low-temperature bolting that stays tough in cryogenic service — A320 L7 and the A320 stainless grades, Charpy tested to the temperature.
Jobs we’ve made in these grades.
Do you have a location in Qatar?
No — everything is made and shipped from our shop at 18401 Intercontinental Crossing Dr, Houston, TX 77073, about 8,000 miles from Qatar in a straight line.
How fast can you get bolting to Qatar?
We ship to Qatar by international air or ocean freight from Houston, with the delivery time and shipping terms quoted on every order. When a unit is down, call +1 832-446-3442 — answered 24/7, Houston time — and we will quote the fastest air option on the call. Made-to-order parts are quoted with a lead time.
Do you ship to Qatar?
Yes. We ship from Houston by international air or ocean freight from Houston, with the delivery time and shipping terms quoted on every order. Parts are made and certified in Houston before they ship.
What certification comes with the parts?
Every lot ships with an EN 10204 3.1 material test report traceable to the heat. EN 10204 3.2, PMI, Charpy and NACE MR0175 compliance are available on request.
What do refineries in Qatar usually order?
Flange and valve bolting for crude, hydrotreating and FCC units — B7 and B7M stud bolts with 2H and 2HM nuts, often PTFE coated, and sour-service grades to NACE MR0175.
What do chemical plants in Qatar usually order?
Corrosion-resistant bolting for process lines, reactors and exchangers — 316 stainless (B8M), duplex and nickel alloys where chlorides or acids attack carbon steel.
What do LNG terminals in Qatar usually order?
Low-temperature bolting that stays tough in cryogenic service — A320 L7 and the A320 stainless grades, Charpy tested to the temperature.
Sources: qatarenergylng.qa · en.wikipedia.org · qatarenergylng.qa · offshore-technology.com · qafco.qa

